RECONSTRUCTION OF THE SUGAR DRYER BUILDING FOR "NORDZUCKER POLAND" S.A. IN CHEŁMŻA


Address: 

Chełmża, 4 Bydgoska St.

Total area: 

969m2

Construction permit: 

2023r.

Implementation: 

2024r.


Idea:

Reconstruction of the sugar drying building, including the replacement of the existing rotary dryer with a new one, with an enlarged size, allowing for simultaneous cooling of sugar to the required temperature, necessary for proper storage in silos and packaging of the final product.

Function:

Reconstruction and adaptation of the interior of building no. 18 - sugar drying plant to a new drying system with an enlarged size. The project includes replacing the entire internal structure for devices and technical platforms, organizing access to the interior of the building through the roof - dismantling and transporting the replaced equipment, and securing the entire structure in accordance with current fire protection conditions. The short design and implementation deadline was due to the production break between subsequent sugar campaigns.

bottom of page